top of page

MODULAR CLASSROOM BLOCK

Roland Hill Ltd was appointed to design, construct, and install a modular classroom block at Cockermouth School to support the growing educational needs of the site. Delivered on a tight programme, the eight-module building was fully set up on site in just one day minimising disruption to the live school environment and showcasing the speed and efficiency of off-site construction.

​

The building was designed with both functionality and energy performance in mind, featuring high levels of insulation, energy-efficient lighting, and modern ventilation systems. The classrooms are bright, spacious, and built to current Department for Education guidelines, ensuring a comfortable and effective learning environment for students.

Screenshot%202021-05-16%20at%2011.45_edi
Screenshot 2021-05-16 at 11.45.53.png
Screenshot 2021-05-16 at 11.45.49.png
constructionline-gold-logo-1 2024.jpg
Screenshot 2021-05-16 at 11.45.17.png
Screenshot 2021-05-16 at 11.44.53.png
Screenshot 2021-05-16 at 11.45.43.png

©ROLAND HILL LIMITED 2025 – ALL RIGHTS RESERVED

bottom of page